[JBoss JIRA] (JBIDE-24656) Split CDK3 server adapter integration tests into separated classes
by Ondrej Dockal (JIRA)
Ondrej Dockal created JBIDE-24656:
-------------------------------------
Summary: Split CDK3 server adapter integration tests into separated classes
Key: JBIDE-24656
URL: https://issues.jboss.org/browse/JBIDE-24656
Project: Tools (JBoss Tools)
Issue Type: Enhancement
Components: integration-tests
Affects Versions: 4.5.0.AM1
Reporter: Ondrej Dockal
Assignee: Ondrej Dockal
Fix For: 4.5.x
I decided to divide quite time-consuming CDK server adapter integration tests into smaller test cases due to time that is needed to run all of these test cases in one test class. The one class with all server adapter test cases will be divide into 4 independent classes.
org.jboss.tools.cdk.ui.bot.test.server.adapter.CDK3IntegrationTest will be split into
CDK3IntegrationStartTest
CDK3IntegrationRestartTest
CDK3IntegrationDockerTest
CDK3IntegrationOpenshiftTest
It will be possible to run cdk pr-check job much faster, if it would contain only one complex test case, instead of 4 test cases that each requires to start cdk 3 server adapter.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 9 months
[JBoss JIRA] (JBIDE-24413) No space left on device for some rhel7-devstudio-releng slaves
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBIDE-24413?page=com.atlassian.jira.plugi... ]
Nick Boldt edited comment on JBIDE-24413 at 7/7/17 2:34 PM:
------------------------------------------------------------
It's back!
{code}
17:51:58 [ERROR] Failed to execute goal org.apache.maven.plugins:maven-assembly-plugin:2.5.4:single (assemble-site) on project org.jboss.tools.site.central.earlyaccess: Failed to create assembly: Error creating assembly archive complete: Problem creating zip: No space left on device -> [Help 1]
17:51:58 org.apache.maven.lifecycle.LifecycleExecutionException: Failed to execute goal org.apache.maven.plugins:maven-assembly-plugin:2.5.4:single (assemble-site) on project org.jboss.tools.site.central.earlyaccess: Failed to create assembly: Error creating assembly archive complete:
Problem creating zip: No space left on device{code} -- https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
See also https://docs.google.com/spreadsheets/d/1YGptkrWlUR3W03J-Mj-_xxzgsMrPwmbMl...
was (Author: nickboldt):
It's back!
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
{code}
17:51:58 [ERROR] Failed to execute goal org.apache.maven.plugins:maven-assembly-plugin:2.5.4:single (assemble-site) on project org.jboss.tools.site.central.earlyaccess: Failed to create assembly: Error creating assembly archive complete: Problem creating zip: No space left on device -> [Help 1]
17:51:58 org.apache.maven.lifecycle.LifecycleExecutionException: Failed to execute goal org.apache.maven.plugins:maven-assembly-plugin:2.5.4:single (assemble-site) on project org.jboss.tools.site.central.earlyaccess: Failed to create assembly: Error creating assembly archive complete: Problem creating zip: No space left on device{code}
> No space left on device for some rhel7-devstudio-releng slaves
> --------------------------------------------------------------
>
> Key: JBIDE-24413
> URL: https://issues.jboss.org/browse/JBIDE-24413
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: build
> Affects Versions: 4.4.4.Final
> Reporter: Nick Boldt
> Assignee: Josef Kopriva
> Fix For: 4.5.0.AM2
>
> Attachments: DiskUsageOnSlave.png, slave-died-in-middle-of-build.txt
>
>
> JIRA to track infrequent failures due to slaves getting their disks full.
> Will collect data over time in this spreadsheet:
> https://docs.google.com/spreadsheets/d/1YGptkrWlUR3W03J-Mj-_xxzgsMrPwmbMl...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 9 months
[JBoss JIRA] (JBTIS-1137) Update Drools TP for Oxygen
by Kris Verlaenen (JIRA)
[ https://issues.jboss.org/browse/JBTIS-1137?page=com.atlassian.jira.plugin... ]
Kris Verlaenen commented on JBTIS-1137:
---------------------------------------
[~pleacu] ok, sounds good. Just let me know here when the new TP version is available. Going with 7.0.1.Final is fine until then.
> Update Drools TP for Oxygen
> ---------------------------
>
> Key: JBTIS-1137
> URL: https://issues.jboss.org/browse/JBTIS-1137
> Project: JBoss Tools Integration Stack
> Issue Type: Task
> Components: drools/ jBPM
> Affects Versions: 11.1.0.GA
> Reporter: Paul Leacu
> Assignee: Paul Leacu
> Fix For: 11.1.0.GA
>
>
> Update the Drools IS TP to 4.5.0.Final when available.
> Kris:
> Regarding the target platform, it's fine to update the community master to that (assuming it's a stable / released target platform, not a snapshot). We should have another community release by Aug hopefully ;)
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)
8 years, 9 months