[JBoss JIRA] (JBDS-4684) Remove "standalone" from installation jar
by Josef Kopriva (JIRA)
[ https://issues.jboss.org/browse/JBDS-4684?page=com.atlassian.jira.plugin.... ]
Josef Kopriva closed JBDS-4684.
-------------------------------
Closing, nothing to do.
> Remove "standalone" from installation jar
> -----------------------------------------
>
> Key: JBDS-4684
> URL: https://issues.jboss.org/browse/JBDS-4684
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Enhancement
> Components: installer
> Affects Versions: 11.3.0.AM2
> Reporter: Josef Kopriva
> Assignee: Nick Boldt
> Priority: Optional
> Fix For: 12.0.0.GA
>
>
> Change jar filename from "devstudio-11.3.0.AM2-v20180301-2015-B2134-installer-standalone.jar" to "devstudio-11.3.0.AM2-v20180301-2015-B2134-installer.jar".
> I do not see a reason to have "standalone" in filename as we do not have jar with bundled EAP for some time.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
7 years, 9 months
[JBoss JIRA] (JBIDE-21895) Application wizard: Resource name collisions after deleting and recreating the application
by Josef Kopriva (JIRA)
[ https://issues.jboss.org/browse/JBIDE-21895?page=com.atlassian.jira.plugi... ]
Josef Kopriva closed JBIDE-21895.
---------------------------------
Closing. User needs to delete resources with "Delete resources".
Verified in:
Red Hat Developer Studio
Version: 12.0.0.GA
Build id: GA-v20180626-0421-B2872
Build date: 20180626-0421
> Application wizard: Resource name collisions after deleting and recreating the application
> ------------------------------------------------------------------------------------------
>
> Key: JBIDE-21895
> URL: https://issues.jboss.org/browse/JBIDE-21895
> Project: Tools (JBoss Tools)
> Issue Type: Bug
> Components: openshift
> Affects Versions: 4.3.1.CR1
> Reporter: Pavol Srna
> Assignee: Andre Dietisheim
> Labels: application_wizard, openshift_v3
> Fix For: 4.6.0.Final
>
> Attachments: 1st-child-of-project.png, Screen Shot 2016-03-17 at 16.19.05.png, Screenshot 2017-02-02 18.22.34.png, Screenshot 2017-02-02 18.22.43.png, os-resources-empty.png
>
>
> 1) Create e.g. node application in a openshift project
> 2) Right click from project explorer -> Delete the application
> 3) repeat step 1)
> Result:
> !Screen Shot 2016-03-17 at 16.19.05.png!
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
7 years, 9 months
[JBoss JIRA] (JBDS-3756) Have single progress bar for download and installation progress
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBDS-3756?page=com.atlassian.jira.plugin.... ]
Nick Boldt closed JBDS-3756.
----------------------------
Resolution: Done
> Have single progress bar for download and installation progress
> ---------------------------------------------------------------
>
> Key: JBDS-3756
> URL: https://issues.jboss.org/browse/JBDS-3756
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Feature Request
> Components: platform-installer
> Reporter: Pete Muir
> Assignee: Mohit Suman
> Priority: Minor
> Labels: ui
> Fix For: 11.3.0.GA
>
>
> Most installers have a single progress bar that shows the overall progress, and then text which explains which component is being installed right now.
> Update:
> After discussion on backlog grooming session it seems reasonable to have two progress bars instead of one. Considering size of downloaded resources and time spend for downloading/installation we might have much longer installation time than now with single progress bar. Instead we can start downloading resources and install them as soon as download is finished. That would let us run installation in sequence and avoid problems with running two MSI installer at the same timed. Also that would save some time and do installation for smaller components while download for big ones is in progress.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
7 years, 9 months
[JBoss JIRA] (JBDS-3756) Have single progress bar for download and installation progress
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBDS-3756?page=com.atlassian.jira.plugin.... ]
Nick Boldt updated JBDS-3756:
-----------------------------
Fix Version/s: 11.3.0.GA
(was: 11.x)
> Have single progress bar for download and installation progress
> ---------------------------------------------------------------
>
> Key: JBDS-3756
> URL: https://issues.jboss.org/browse/JBDS-3756
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Feature Request
> Components: platform-installer
> Reporter: Pete Muir
> Assignee: Mohit Suman
> Priority: Minor
> Labels: ui
> Fix For: 11.3.0.GA
>
>
> Most installers have a single progress bar that shows the overall progress, and then text which explains which component is being installed right now.
> Update:
> After discussion on backlog grooming session it seems reasonable to have two progress bars instead of one. Considering size of downloaded resources and time spend for downloading/installation we might have much longer installation time than now with single progress bar. Instead we can start downloading resources and install them as soon as download is finished. That would let us run installation in sequence and avoid problems with running two MSI installer at the same timed. Also that would save some time and do installation for smaller components while download for big ones is in progress.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
7 years, 9 months
[JBoss JIRA] (JBDS-3868) Document (and check) required disk space before beginning install
by Nick Boldt (JIRA)
[ https://issues.jboss.org/browse/JBDS-3868?page=com.atlassian.jira.plugin.... ]
Nick Boldt closed JBDS-3868.
----------------------------
Resolution: Done
> Document (and check) required disk space before beginning install
> -----------------------------------------------------------------
>
> Key: JBDS-3868
> URL: https://issues.jboss.org/browse/JBDS-3868
> Project: Red Hat JBoss Developer Studio (devstudio)
> Issue Type: Bug
> Components: platform-installer
> Affects Versions: 9.1.0.Beta1
> Environment: Windows 7/64 bit
> Reporter: Robert Terzi
> Assignee: Mohit Suman
> Priority: Minor
> Labels: ui
> Fix For: 11.3.0.GA
>
> Attachments: cnf-review.png, confirmation-page.png, screenshot-1.png
>
>
> The installer and it's documentation should indicate the minimum required disk space before beginning the download and installation process.
> Between temporary files, and download/installs going on in parallel. I'm guessing at least 10-15 GB free is needed.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
7 years, 9 months