]
Max Rydahl Andersen commented on JBIDE-3461:
--------------------------------------------
hehe - feel free to hunt down more ;)
Small shutdown changes: After Jboss server shutdown from eclipse IDE
the CPU time is significantly increased
-------------------------------------------------------------------------------------------------------------
Key: JBIDE-3461
URL:
https://jira.jboss.org/jira/browse/JBIDE-3461
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: JBossAS
Affects Versions: 3.0.0.cr1
Environment: Vista x64; Eclipse 3.4.1_win32_x64; JBoss server 5.0.0 GA and JBoss
server 4.2.3 GA; Java 1.6.0_11 x64
Reporter: Tomaz Zupan
Assignee: Rob Stryker
Priority: Minor
Fix For: 3.0.0.CR2
If JBoss server (i.e. JBoss, a division of Red Hat/JBoss 5) is started and stoped from
Eclipse IDE, then after server is stoped, CPU of the eclipse process is significantly
incresed from 0% to 50%. If you repeat it again after second serven shutdown CPU time is
increased to 100%.
I tried the same procedure on generic JBoss 4.2 server runtime and there is no problem.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: