]
Robert (Bob) Brodt closed JBIDE-6839.
-------------------------------------
Not an issue
BPEL Validator is called twice for every BPEL resource in a project
when editor is saved
----------------------------------------------------------------------------------------
Key: JBIDE-6839
URL:
https://issues.jboss.org/browse/JBIDE-6839
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: bpel
Reporter: Robert (Bob) Brodt
Assignee: Robert (Bob) Brodt
Priority: Minor
Fix For: 3.2.1
Original Estimate: 0 minutes
Remaining Estimate: 0 minutes
Need to figure out why the model defines both a org.eclipse.core.resources.builders and a
org.eclipse.wst.validation.validator extension point - both of these eventually call the
model Builder.validate(). The result is that ALL BPEL files in a project get validated
TWICE whenever you save a BPEL editor resource.
--
This message is automatically generated by JIRA.
For more information on JIRA, see: