]
Denis Golovin commented on JBIDE-20453:
---------------------------------------
I would go for ultimate solution and just provide one offline zip with everything
included, because changing from 4 zips to 2 zips still require to do several downloads.
The final offline install zip would be ~ 150M bigger.
Instead of 4 zips, merge Central+TP and EA+TP into combined repos for
easier offline use
----------------------------------------------------------------------------------------
Key: JBIDE-20453
URL:
https://issues.jboss.org/browse/JBIDE-20453
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build, central, updatesite
Affects Versions: 4.3.0.Beta2
Reporter: Nick Boldt
Assignee: Nick Boldt
Priority: Blocker
Fix For: 4.3.0.CR1
Today the offline solution [1], [2] for installing stuff from Central or Early Access
requires a pair of zips: the 3rd party content (target platform), and the stuff from JBoss
Tools.
[1]
http://www.jboss.org/products/devstudio/download/ (Central Zip doesn't include
the JBT stuff, just the 3rd party / TP content)
[2]
https://devstudio.redhat.com/9.0/staging/updates/ (both zips shown)
We should combine these into a single, larger zip, such that the offline solution
requires only a single zip and there's no confusion about what a Central Zip is.