[
https://issues.jboss.org/browse/JBTIS-529?page=com.atlassian.jira.plugin....
]
Nick Boldt updated JBTIS-529:
-----------------------------
Description:
not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you
get the "Fuse Integration Project" despite Fuse is only earlyaccess.
But even with or without earlyaccess installing via the wizard result in:
Problems occurred while performing installation: There are no connectors to install
There are no connectors to install
/cc [~fbricon] any idea ?
was:
not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you
get the "Fuse Integraiotn Project" despite Fuse is only earlyaccess.
But even with or without earlyaccess installing via the wizard result in:
Problems occurred while performing installation: There are no connectors to install
There are no connectors to install
/cc [~fbricon] any idea ?
fuse fails to install from jboss central
----------------------------------------
Key: JBTIS-529
URL:
https://issues.jboss.org/browse/JBTIS-529
Project: JBoss Tools Integration Stack
Issue Type: Bug
Reporter: Max Rydahl Andersen
Assignee: Fred Bricon
Priority: Blocker
Labels: respin-b
Fix For: 4.3.0.Alpha2
not sure where the fault is here but when you open JBDS 9 and type in 'Fuse' you
get the "Fuse Integration Project" despite Fuse is only earlyaccess.
But even with or without earlyaccess installing via the wizard result in:
Problems occurred while performing installation: There are no connectors to install
There are no connectors to install
/cc [~fbricon] any idea ?
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)