[
https://issues.jboss.org/browse/JBDS-3849?page=com.atlassian.jira.plugin....
]
Nick Boldt edited comment on JBDS-3849 at 4/25/16 10:26 PM:
------------------------------------------------------------
New PR...
https://github.com/redhat-developer-tooling/developer-platform-install/pu...
With Denis' help, this task will block doing the 7 downloads and 7 copies before
proceeding to the next task.
However, I end up with a 1GB .exe instead of a 1.5GB one.
was (Author: nickboldt):
New PR...
https://github.com/redhat-developer-tooling/developer-platform-install/pu...
Problem here is that I can't quite figure out how to make the prefetch task block
until all 7 downloads & copies are done.
Need suggestion on where to put the callback, since where I have it doesn't work
(packaging happens in parallel WHILE the big downloads are still being downloaded or
copied from cache).
Store downloaded requirements for bundled installer between builds
------------------------------------------------------------------
Key: JBDS-3849
URL:
https://issues.jboss.org/browse/JBDS-3849
Project: Developer Studio (JBoss Developer Studio)
Issue Type: Enhancement
Components: platform-installer
Affects Versions: 10.0.0.Alpha1
Reporter: Denis Golovin
Assignee: Nick Boldt
Labels: havoc
Fix For: 10.0.0.Alpha1
Attachments: works-but-too-small.png
Now build downloads all bundled binaries in every build, because the got wiped out by
clean task.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)