[
https://issues.jboss.org/browse/JBIDE-26562?page=com.atlassian.jira.plugi...
]
Andre Dietisheim commented on JBIDE-26562:
------------------------------------------
[~snjeza] Thx for chiming in, I just found the issue with the help of [~rob.stryker] I
think. The problem was 2-fold:
* The server launch controller was joining with a job that would activate a maven profile.
The maven job being locked out by concurrent build jobs made the launcher stuck waiting.
* the maven profile activation job was not requesting the workspace lock (via scheduling
rules) right away. It just got stalled waiting for concurrent workspace build jobs to
release the workspace lock.
debugging does not work for eap-cd-basic-s2i template from CRC
--------------------------------------------------------------
Key: JBIDE-26562
URL:
https://issues.jboss.org/browse/JBIDE-26562
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: cdk, openshift, server
Affects Versions: 4.11.0.AM1
Environment: F29, devstudio AM1-v20190221-1020-B4114, CDK v3.8.0-alpha.1-1
Reporter: Josef Kopriva
Assignee: Andre Dietisheim
Priority: Critical
Fix For: 4.11.0.Final
Attachments: image-2019-02-26-10-19-19-366.png,
image-2019-03-14-16-30-04-450.png, image-2019-03-18-12-06-33-851.png
Restarting server adapter in debug for openshift application results in not responding
job *Enabling "openshift maven profile"*:
!image-2019-02-26-10-19-19-366.png|thumbnail!
--
This message was sent by Atlassian Jira
(v7.12.1#712002)