[
https://issues.jboss.org/browse/JBDS-3961?page=com.atlassian.jira.plugin....
]
Budh Ram Gurung commented on JBDS-3961:
---------------------------------------
Hi Denis,
I have updated jira with my observations. Please have a look.
Regards,
Budh Ram Gurung
Software Engineer - Dev Tools
On Wed, Jul 6, 2016 at 10:36 AM, Denis Golovin (JIRA) <issues(a)jboss.org>
CDK installation failed with progress bar stuck in 99%
------------------------------------------------------
Key: JBDS-3961
URL:
https://issues.jboss.org/browse/JBDS-3961
Project: Red Hat JBoss Developer Studio (devstudio)
Issue Type: Bug
Components: platform-installer
Environment: h3. Operating System:
Windows 10 Pro 64 Bit
h3. Devstudio version
Devstudio 1.0 GA
Reporter: Budh Ram Gurung
Assignee: Denis Golovin
Labels: cdk
Fix For: 10.1.0.AM2
Attachments: dev_studio_installation.PNG, install.log
I was trying the "devstudio 1.0 GA build"
("development-suite-1.0.0-GA-bundle-installer.exe") and unable to get CDK
installation after gone through the steps of authentication, vagrant, cygwin, jboss dev
studio installations.
Observations:
CDK installation stuck in 99% with "failed" mark.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)