[
https://issues.jboss.org/browse/JBIDE-23734?page=com.atlassian.jira.plugi...
]
Ilya Buziuk commented on JBIDE-23734:
-------------------------------------
[~nickboldt] IMO running integration tests on a weekly basis is enough - VPE is in a deep
support phase with ~ 10 - 20 new commits per year and I do not think there will be any
active development in foreseeable future (it would be great to have a possibility to run
them on demand though via "itestPR"). Also, +1 for running unit / UI tests on PR
check
dedupe vpe unit test jobs / migrate vpe builds to CCI
-----------------------------------------------------
Key: JBIDE-23734
URL:
https://issues.jboss.org/browse/JBIDE-23734
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build, integration-tests
Affects Versions: 4.4.3.AM1
Reporter: Nick Boldt
Assignee: Rastislav Wagner
Fix For: 4.4.3.Final
There are four VPE unit test jobs. We probably only need 2 of those.
These both run on multiple OSes:
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
https://jenkins.mw.lab.eng.bos.redhat.com/hudson/view/DevStudio/view/DevS...
These probably run the same unit tests, but against master or 4.4.x branches, and are
called from the VPE build jobs [1], [2] on Boston MW Jenkins (because the tests were
failing to run in Boston):
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
[1]
http://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/jbosstools-vpe_master/
[2]
http://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/jbosstools-vpe_4.4.neon/
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)