[
https://issues.jboss.org/browse/JBDS-4642?page=com.atlassian.jira.plugin....
]
Nick Boldt commented on JBDS-4642:
----------------------------------
I'm curious why this Epic was created with subtasks (which will inherit the
parent's sprint) rather than creating issues IN the epic (which can be assigned to
different sprints).
If the above doesn't matter, ignore me. If it does, the subtasks should all be
converted to full issues / tasks, then linked to this epic.
JDK9 Certification
------------------
Key: JBDS-4642
URL:
https://issues.jboss.org/browse/JBDS-4642
Project: Red Hat JBoss Developer Studio (devstudio)
Issue Type: Epic
Components: build
Reporter: Pavol Srna
Fix For: 11.x
This is an epic for tracking JDK9 Devstudio Certification.
All components need to be retested (run) with JDK9. Please link issues found here.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)