Alexey Kazakov commented on JBDS-3525:
--------------------------------------
And BTW. EA update site is added only when I started to install anything from central with
EA enabled. Shouldn't we add the EA update site as soon as EA is enabled in Central
and not wait for an actual installation attempt?
Problems updating Early Access content between milestones (eg.,
Arquillian from Beta1 -> CR1, CR1 -> GA)
--------------------------------------------------------------------------------------------------------
Key: JBDS-3525
URL:
https://issues.jboss.org/browse/JBDS-3525
Project: Developer Studio (JBoss Developer Studio)
Issue Type: Bug
Components: central
Affects Versions: 9.0.0.Beta2
Environment: Version: 9.0.0.CR1
Build id: CR1-v20150912-1100-B100
Build date: 20150912-1100
Enabled Early Access
Reporter: Marek Novotny
Assignee: Nick Boldt
Priority: Critical
Fix For: 9.0.1.GA, 10.0.0.Alpha1
Attachments: arquillian-in-jbt.png, updates-sites.xml
JBDS notified me about a new update for Arquillian, but then after going into update it
complains about:
{noformat}
An error occurred while collecting items to be installed
session context was:(profile=jbds,
phase=org.eclipse.equinox.internal.p2.engine.phases.Collect, operand=, action=).
No repository found containing:
osgi.bundle,org.jboss.tools.arquillian.core,1.2.0.CR1-v20150911-0332-B19
No repository found containing:
osgi.bundle,org.jboss.tools.arquillian.maven.configurator,1.2.0.CR1-v20150911-0332-B19
No repository found containing:
osgi.bundle,org.jboss.tools.arquillian.ui,1.2.0.CR1-v20150911-0332-B19
No repository found containing:
org.eclipse.update.feature,org.jboss.tools.arquillian.feature,1.2.0.CR1-v20150911-0332-B19
{noformat}