[
https://issues.jboss.org/browse/JBIDE-22269?page=com.atlassian.jira.plugi...
]
Martin Malina commented on JBIDE-22269:
---------------------------------------
OK, thinking about it again, you're probably right that there may be a better place
for this other than jbosstools-integration-tests, because this is not a bot test that
requires a running eclipse at all. This is quite a simple test of the layout of
EAP/WildFly. So I agree that there should be some better place for this - perhaps in the
overall testsuite of EAP.
Work with WildFly/EAP to generate unit tests on server installation
layout
--------------------------------------------------------------------------
Key: JBIDE-22269
URL:
https://issues.jboss.org/browse/JBIDE-22269
Project: Tools (JBoss Tools)
Issue Type: Task
Components: server
Affects Versions: 4.4.0.Alpha1
Reporter: Rob Stryker
Assignee: Rob Stryker
Fix For: 4.4.1.AM2
Attachments: JBIDE-22269.mock.zip
A task to track work on making sure changes to EAP don't inadvertently break tools
when changing directory structure or important keys we read.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)