[
https://issues.jboss.org/browse/JBDS-3924?page=com.atlassian.jira.plugin....
]
Misha Ali commented on JBDS-3924:
---------------------------------
Sorry, I just confirmed, this is in the f22 machine, not the f23 one. I'll
update the environment info in the bug as well.
Thanks,
Misha Husnain Ali
Technical Writer 2, CCS Brisbane
Installation looks incomplete but is actually completed
-------------------------------------------------------
Key: JBDS-3924
URL:
https://issues.jboss.org/browse/JBDS-3924
Project: Red Hat JBoss Developer Studio (devstudio)
Issue Type: Bug
Components: installer
Affects Versions: 10.0.0.GA
Environment: Fedora 23
Using devstudio-10.0.0.GA-v20160603-1025-B5510-installer-standalone.jar
jvm: java-1.8.0-openjdk-1.8.0.91-2.b14.fc22.x86_64
Reporter: Misha Ali
Assignee: Denis Golovin
Labels: install, installation, installer
Fix For: 10.x
Attachments: devstudio10install.png, incomplete_install.png
Running the standalone installer file starts the devstudio install as expected, but twice
I have noticed that the Next button is available to click (indicating that the
installation has completed) when the status shows that only 2/3 of the installation steps
are concluded. (see screenshot for this screen).
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)