[
https://issues.jboss.org/browse/JBDS-3779?page=com.atlassian.jira.plugin....
]
Denis Golovin commented on JBDS-3779:
-------------------------------------
We can move cygwin to be first component to install and add offline istallation for it
from local backage (need to be created during the build and included into bundle).
Overall order can be cygwin->vagrant->virtualbox->cdk. Virualbox still have to
wait until all downloads are finished, before proceeding with installation.
Consider changing the installation order
----------------------------------------
Key: JBDS-3779
URL:
https://issues.jboss.org/browse/JBDS-3779
Project: Developer Studio (JBoss Developer Studio)
Issue Type: Enhancement
Components: installer
Affects Versions: 9.1.0.CR1
Reporter: Jan Richter
Assignee: Denis Golovin
Labels: havoc
Fix For: 10.0.0.Alpha1
Right now there are the following installation 'streams':
1. JDK -> JBDS - looks fine to me
2. Virtualbox -> Cygwin -> Vagrant -> CDK - this is the one I have an issue
with.
The second stream starts with Virtualbox which first needs to be downloaded. Maybe some
other component could do something productive while Virtualbox is downloading so it might
save some time. In other words - could something other than a download start the
installation?
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)