https://issues.jboss.org/browse/JBIDE-24547?page=com.atlassian.jira.plugi...
]
Rob Stryker commented on JBIDE-24547:
-------------------------------------
Can you clarify what you mean by unit tests vs integration tests?
I would like to make sure you are not assuming all UI / reddeer tests are integration
tests. I have a few plugins that are UI tests but are NOT integration tests. They are
simple reddeer UI tests.
You should not assume this fits cleanly into unit vs integration at all.
Refactor ITests settings in parent pom
--------------------------------------
Key: JBIDE-24547
URL:
https://issues.jboss.org/browse/JBIDE-24547
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build, integration-tests
Reporter: Pavol Srna
Assignee: Pavol Srna
Fix For: 4.5.0.AM1
It is desired that single 'mvn clean verify' command will run *unit tests* and
*integration tests* in a single run. Parent pom should hold all shared settings across
jbosstools repositories (e.g pluginCustomization, useUIThread etc ).
The problem is that unit tests require useUIThread=true, but integration tests the
opposite. We need to come with a solution where we share the settings in parent pom.
--
This message was sent by Atlassian JIRA