[
https://issues.jboss.org/browse/JBIDE-23019?page=com.atlassian.jira.plugi...
]
Radim Hopp updated JBIDE-23019:
-------------------------------
Sprint: devex #123 November 2016, devex #128 February 2017, devex #130 April 2017
(was: devex #123 November 2016, devex #128 February 2017)
Integration tests: have them running automatically, continuously
----------------------------------------------------------------
Key: JBIDE-23019
URL:
https://issues.jboss.org/browse/JBIDE-23019
Project: Tools (JBoss Tools)
Issue Type: Feature Request
Components: integration-tests, openshift
Affects Versions: 4.4.1.AM3
Reporter: Andre Dietisheim
Assignee: Radim Hopp
Labels: integration_tests
Fix For: 4.5.0.AM1
The integration tests suite is very lenghty to run and should thus be run in a continuous
manner on our CI.
There are several pain-points currently:
- there's no dedicated OS instance to run them against
- tests are not stable
- etc.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)