[
https://issues.jboss.org/browse/JBDS-3985?page=com.atlassian.jira.plugin....
]
Paul Leacu edited comment on JBDS-3985 at 8/3/16 4:31 PM:
----------------------------------------------------------
Added a new installation progress step - there will be +1 if the runtime is specified
(i.e. 4) as occurs with EAP. No change if no runtime is specified. See PR:
https://github.com/jbdevstudio/jbdevstudio-product/pull/391
[~dgolovin1] [~akazakov] ^^
ref:
http://download.jboss.org/jbosstools/neon/staging/updates/integration-sta...
was (Author: pleacu):
Added a new installation progress step - there will be +1 if the runtime is specified
(i.e. 4) as occurs with EAP. No change if no runtime is specified. See PR:
https://github.com/jbdevstudio/jbdevstudio-product/pull/391
[~dgolovin1] [~akazakov] ^^
Modify installation progress bar to include supplemental runtimes
-----------------------------------------------------------------
Key: JBDS-3985
URL:
https://issues.jboss.org/browse/JBDS-3985
Project: Red Hat JBoss Developer Studio (devstudio)
Issue Type: Bug
Components: installer
Affects Versions: 10.1.0.AM1
Reporter: Paul Leacu
Assignee: Paul Leacu
Priority: Minor
Attachments: x1.png, x2.png
At install time, if an additional runtime is specified it does not appear in the overall
progress bar.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)