[
https://issues.jboss.org/browse/JBIDE-24900?page=com.atlassian.jira.plugi...
]
Lukáš Valach updated JBIDE-24900:
---------------------------------
Sprint: devex #137 September 2017
Configure cdi.it.smoke to have cdi10/cdi11 axis
-----------------------------------------------
Key: JBIDE-24900
URL:
https://issues.jboss.org/browse/JBIDE-24900
Project: Tools (JBoss Tools)
Issue Type: Task
Components: integration-tests
Affects Versions: 4.5.1.AM2
Reporter: Lukáš Valach
Assignee: Lukáš Valach
Fix For: 4.5.1.AM2
CDI.it.smoke \[1\] takes a long (about 4 hours). We can add cdi10/cdi11 axis to run tests
parallely.
\[1\]
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)