[
https://issues.jboss.org/browse/JBDS-3924?page=com.atlassian.jira.plugin....
]
Misha Ali commented on JBDS-3924:
---------------------------------
Tried a third time, same environment as above, new installation folder and got only as far
as 1/3 of the install, as indicated by the installer (see attached screenshot). The
install has completed, but this is misleading to users. I've alerted Len about this
and he is trying to reproduce it.
Installation looks incomplete but is actually completed
-------------------------------------------------------
Key: JBDS-3924
URL:
https://issues.jboss.org/browse/JBDS-3924
Project: Red Hat JBoss Developer Studio (devstudio)
Issue Type: Bug
Components: installer
Affects Versions: 10.0.0.GA
Environment: Fedora 23
Using devstudio-10.0.0.GA-v20160603-1025-B5510-installer-standalone.jar
jvm: java-1.8.0-openjdk-1.8.0.91-2.b14.fc22.x86_64
Reporter: Misha Ali
Assignee: Denis Golovin
Labels: install, installation, installer
Fix For: 10.x
Attachments: devstudio10install.png
Running the standalone installer file starts the devstudio install as expected, but twice
I have noticed that the Next button is available to click (indicating that the
installation has completed) when the status shows that only 2/3 of the installation steps
are concluded. (see screenshot for this screen).
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)