[
https://issues.jboss.org/browse/JBIDE-19506?page=com.atlassian.jira.plugi...
]
Andre Dietisheim edited comment on JBIDE-19506 at 2/5/16 10:15 AM:
-------------------------------------------------------------------
1sdt bunch of tests and corrections to the model pushed in 4.3.1.CR1 timeframe to
jbosstools-4.3.x and master:
https://github.com/jbosstools/jbosstools-openshift/pull/949/files.
Postponing rest for later
was (Author: adietish):
1sdt bunch of tests and corrections to the model pushed to jbosstools-4.3.x, master:
https://github.com/jbosstools/jbosstools-openshift/pull/949/files.
Postponing rest for later
Connection wizard: should have unit tests
------------------------------------------
Key: JBIDE-19506
URL:
https://issues.jboss.org/browse/JBIDE-19506
Project: Tools (JBoss Tools)
Issue Type: Enhancement
Components: openshift
Affects Versions: 4.3.0.Alpha2
Reporter: Andre Dietisheim
Assignee: Andre Dietisheim
Labels: openshift_v3, tests
Fix For: 4.4.0.Alpha1
In the new implementation of the connection wizard, that allows v2 and v3 connections
(JBIDE-19096) we have rather complex behaviour that we should assert via unit tests.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)