]
Max Rydahl Andersen updated JBDS-3502:
--------------------------------------
Project: Developer Studio (JBoss Developer Studio) (was: Tools (JBoss
Tools))
Key: JBDS-3502 (was: JBIDE-20453)
Workflow: CDW v1 (was: GIT Pull Request workflow )
Affects Version/s: (was: 4.3.0.Beta2)
Component/s: build
central
updatesite
(was: build)
(was: updatesite)
(was: central)
Fix Version/s: 9.0.0.CR1
(was: 4.3.0.CR1)
Docs QE Status: NEW
Instead of 4 zips, merge Central+TP and EA+TP into 2 composite repos
for easier offline use (similar to what we had for JBDS 8)
-------------------------------------------------------------------------------------------------------------------------------
Key: JBDS-3502
URL:
https://issues.jboss.org/browse/JBDS-3502
Project: Developer Studio (JBoss Developer Studio)
Issue Type: Bug
Components: build, central, updatesite
Reporter: Nick Boldt
Assignee: Nick Boldt
Priority: Blocker
Fix For: 9.0.0.CR1
Today the offline solution [1], [2] for installing stuff from Central or Early Access
requires a pair of zips: the 3rd party content (target platform), and the stuff from JBoss
Tools.
[1]
http://www.jboss.org/products/devstudio/download/ (Central Zip doesn't include
the JBT stuff, just the 3rd party / TP content)
[2]
https://devstudio.redhat.com/9.0/staging/updates/ (both zips shown)
We should combine these into a single, larger zip, such that the offline solution
requires only a single zip and there's no confusion about what a Central Zip is.