Nick Boldt edited comment on JBIDE-23567 at 5/16/17 3:52 PM:
-------------------------------------------------------------
Incomplete for 4.4.4.Final so slip to 4.5.0.AM1.
Also made sure that all unassigned subtasks have an owner. Fixversions for subtasks also
pushed out to 4.5.0.AM1, since there is no 4.4.x.
was (Author: nickboldt):
Incomplete for 4.4.4.Final so slip to 4.5.0.AM1
Integration tests global refactoring
------------------------------------
Key: JBIDE-23567
URL:
https://issues.jboss.org/browse/JBIDE-23567
Project: Tools (JBoss Tools)
Issue Type: Task
Components: integration-tests
Reporter: Jeff MAURY
Assignee: Jeff MAURY
Labels: integration-test, integration_tests
Fix For: 4.5.0.AM1
We should done some work on integration tests so that we can rely on them to improve our
code quality and reduce the technical debt.
A sprint will be dedicated.
Here are the tasks we should work on:
* run tests from Maven and document how to run them if specific steps are required
* If failure, fix the failed tests
* Refactor / move tests to the components repository
* Fix/make sure tests are run in PR check
This huge task should be done component per component. Sub-tasks JIRA will be created for
each component.
You can use this document as a starting
point:[https://docs.google.com/document/d/1bl8pJ2aW65UpyGpr3qxoAUREDWL26N...
--