[
https://issues.jboss.org/browse/JBIDE-24485?page=com.atlassian.jira.plugi...
]
Nick Boldt commented on JBIDE-24485:
------------------------------------
Shaved 10 mins off the elapsed time, compared to the 65 mins needed for 4.5.0.* milestone
staging.
{code}
jbosstools-releng-push-to-staging-02-copy-builds-and-update-sites_jbt 5 (4.5.1.AM2)
OVERALL TIME 26 MIN
1 core 25-30 mins
2 coretests 20-30 mins
3 ea central 2m25
4 browsersim 56s
5 itests 1m42
6 fuse extras 37s
jbosstools-releng-push-to-staging-02-copy-builds-and-update-sites_ds 5 (11.1.0.AM2)
OVERALL TIME 56 MIN
1 ds installer 55 min
2 ds tp 8m9
3 ea central zips 52s
4 ea central 3m29
5 rpm 4m46
6 fuse extras 30s{code}
Will check publish times for milestone release next week
Refactoring: split release job into two pieces so jbosstools and
devstudio can run in parallel to save time
-----------------------------------------------------------------------------------------------------------
Key: JBIDE-24485
URL:
https://issues.jboss.org/browse/JBIDE-24485
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build
Affects Versions: 4.5.0.AM1
Reporter: Nick Boldt
Assignee: Nick Boldt
Labels: releasework
Fix For: 4.5.1.AM2
Should split release job [1] into two pieces so jbosstools and devstudio can run in
parallel to save time.
[1]
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/jbosstoo...
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)