VPE build + tests takes over 4hrs to run
----------------------------------------
Key: JBIDE-9048
URL:
https://issues.jboss.org/browse/JBIDE-9048
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: Visual Page Editor core
Affects Versions: 3.3.0.M2
Reporter: Nick Boldt
Assignee: Yahor Radtsevich
Fix For: 3.3.0.M3
Since May 26 (when I ran this job w/ tests disabled), VPE build takes over 4hrs to run.
http://hudson.qa.jboss.com/hudson/view/DevStudio/view/DevStudio_Trunk/por...
We used to have 219 tests; now we have only 11 (perhaps because they take too long, they
timeout and fail).
Could the long-running integration tests be split out from the short-running junits / bot
tests?
http://devstudio.pad.engineering.redhat.com/4
Or is a better solution to build & publish in this job, THEN run tests as a downstream
job (or downstream job config within the same job, if we don't care about
multiplatform testing) ?
--
This message is automatically generated by JIRA.
For more information on JIRA, see:
http://www.atlassian.com/software/jira