https://issues.jboss.org/browse/JBIDE-24485?page=com.atlassian.jira.plugi...
]
Nick Boldt edited comment on JBIDE-24485 at 9/19/17 8:13 PM:
-------------------------------------------------------------
Overall time for publishing the AM2 milestone using the matrices was 32 mins, with similar
times as above for the staging step.
So I've deleted these jobs as we no longer need them:
*
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
*
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
was (Author: nickboldt):
Overall time for publishing the AM2 milestone using the matrices was 32 mins, with similar
times as above for the staging step.
So i've deleted tehse jobs as we no longer need them:
*
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
*
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
Refactoring: split release job into two pieces so jbosstools and
devstudio can run in parallel to save time
-----------------------------------------------------------------------------------------------------------
Key: JBIDE-24485
URL:
https://issues.jboss.org/browse/JBIDE-24485
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build
Affects Versions: 4.5.0.AM1
Reporter: Nick Boldt
Assignee: Nick Boldt
Labels: releasework
Fix For: 4.5.1.AM2
Should split release job [1] into two pieces so jbosstools and devstudio can run in
parallel to save time.
[1]
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/jbosstoo...
--
This message was sent by Atlassian JIRA