[
https://issues.jboss.org/browse/JBDS-3525?page=com.atlassian.jira.plugin....
]
Alexey Kazakov commented on JBDS-3525:
--------------------------------------
If there is no EA site listed in available update sites why this notification of a new
available Arquilian appears?
Btw I just tried your:
{quote}
1. Install JBDS 9.0.0.CR1 (from
http://www.jboss.org/download-manager/file/jboss-devstudio-9.0.0.CR1-stan... as
seen on
http://www.jboss.org/products/devstudio/download/ )
2. Install Arquillian 1.2.0.CR1 from
https://devstudio.redhat.com/9.0/development/updates/discovery.earlyacces...
3. After install & restart of JBDS, go to Window > Preferences > Install/Update
> Available Software Sites and delete or disable the above CR1 site. Leave only the
https://devstudio.redhat.com/9.0/stable/updates/ site enabled.
(this synthesizes having 9.0.0.CR1 and installing it from the older Central from CR1.
There's another way to achieve this using -D flags but it requires more cold starts of
JBDS.)
4. Now fire up Central and look for Arquillian. Yep, it's unavailable.
5. So, check the box for Enable Early Access. Still unavailable?
6. Now, check the box for Show installed. Voila! It's available and installable.
{quote}
But instead of #4 I just checked for updates and successfully updated Arquillian CR1 to
Final having the only
http://download.jboss.org/jbosstools/mars/snapshots/updates/
enabled.
Where did it come from?
I thought it works in that way:
1. When you check Enable EA in central then the EA discovery update site is added to the
list of available and enabled update sites. So you can install EA content from it.
2. When you uncheck EA then its site removed from the list.
But it's differently much more complicated.
Can you explain me how it currently works actually?
Problems updating Early Access content between milestones (eg.,
Arquillian from Beta1 -> CR1, CR1 -> GA)
--------------------------------------------------------------------------------------------------------
Key: JBDS-3525
URL:
https://issues.jboss.org/browse/JBDS-3525
Project: Developer Studio (JBoss Developer Studio)
Issue Type: Bug
Components: arquillian
Affects Versions: 9.0.0.Beta2
Environment: Version: 9.0.0.CR1
Build id: CR1-v20150912-1100-B100
Build date: 20150912-1100
Enabled Early Access
Reporter: Marek Novotny
Assignee: Nick Boldt
Fix For: 9.0.1.GA, 10.0.0.Alpha1
JBDS notified me about a new update for Arquillian, but then after going into update it
complains about:
{noformat}
An error occurred while collecting items to be installed
session context was:(profile=jbds,
phase=org.eclipse.equinox.internal.p2.engine.phases.Collect, operand=, action=).
No repository found containing:
osgi.bundle,org.jboss.tools.arquillian.core,1.2.0.CR1-v20150911-0332-B19
No repository found containing:
osgi.bundle,org.jboss.tools.arquillian.maven.configurator,1.2.0.CR1-v20150911-0332-B19
No repository found containing:
osgi.bundle,org.jboss.tools.arquillian.ui,1.2.0.CR1-v20150911-0332-B19
No repository found containing:
org.eclipse.update.feature,org.jboss.tools.arquillian.feature,1.2.0.CR1-v20150911-0332-B19
{noformat}
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)