[
https://issues.jboss.org/browse/JBIDE-24956?page=com.atlassian.jira.plugi...
]
Nick Boldt edited comment on JBIDE-24956 at 9/12/17 1:18 PM:
-------------------------------------------------------------
PR is merged. But integration-tests build is still red, because upstream coretests build
is red (because of central, which should now be fixed after merging more PRs).
{code}
16:43:02 [ERROR] Missing requirement: org.jboss.tools.central.reddeer
2.1.101.v20170822-1709 requires 'bundle org.jboss.reddeer.go [1.2.0,2.0.0)' but it
could not be found
{code}
Respinning coretests here:
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
was (Author: nickboldt):
PR is merged. But integration-tests build is still red, because upstream coretests build
is red (because of central, which should now be fixed after merging more PRs).
{code}
16:43:02 [ERROR] Missing requirement: org.jboss.tools.central.reddeer
2.1.101.v20170822-1709 requires 'bundle org.jboss.reddeer.go [1.2.0,2.0.0)' but it
could not be found
{code}
Respinning coretests here:
https://dev-platform-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/view/Devstud...
CDK: refactor integration tests for use with RedDeer 2.0
--------------------------------------------------------
Key: JBIDE-24956
URL:
https://issues.jboss.org/browse/JBIDE-24956
Project: Tools (JBoss Tools)
Issue Type: Task
Components: cdk, integration-tests
Affects Versions: 4.5.1.AM1
Reporter: Ondrej Dockal
Assignee: Ondrej Dockal
Fix For: 4.5.1.AM2
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)