https://issues.jboss.org/browse/JBIDE-24547?page=com.atlassian.jira.plugi...
]
Pavol Srna commented on JBIDE-24547:
------------------------------------
I investigated and found out that we cannot use maven lifecycle to have separate settings
for unit tests, UI tests and itests. All are run by tycho surefire and in the same
'integration-test' phase. So I'm coming with 2 other options:
1) run itests by default. Disadvantage is that we need copy/paste itests settings into
given folder-of-tests and there will be many. which makes the maintenance harder. PR is
here:
https://github.com/jbosstools/jbosstools-build/pull/256
2) disable itests by default, and keep itests configuration in ITests profile. Advantage
is that the build won't take ages by default (itests disabled), itests configuration
is stored in ITests profile (don't need to copy everything to all folders-of-tests).
To run the build with itests you need to call: `mvn verify -PITests` PR is here:
https://github.com/jbosstools/jbosstools-build/pull/255
[~nickboldt], [~jeffmaury]. Please look at the PRs, review, comment and pick one preferred
option.
Thanks!
Refactor ITests settings in parent pom
--------------------------------------
Key: JBIDE-24547
URL:
https://issues.jboss.org/browse/JBIDE-24547
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build, integration-tests
Reporter: Pavol Srna
Assignee: Pavol Srna
Fix For: 4.5.0.AM1
It is desired that single 'mvn clean verify' command will run *unit tests* and
*integration tests* in a single run. Parent pom should hold all shared settings across
jbosstools repositories (e.g pluginCustomization, useUIThread etc ).
The problem is that unit tests require useUIThread=true, but integration tests the
opposite. We need to come with a solution where we share the settings in parent pom.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)