[
https://issues.jboss.org/browse/JBIDE-16755?page=com.atlassian.jira.plugi...
]
Nick Boldt commented on JBIDE-16755:
------------------------------------
[~mickael_istria] "A build timeout can be a symptom of a target-platform which is
more recent than the Eclipse instance. Then it might force p2 to update much more stuff
than necessary." ... this is true, but the install grinder job has been failing since
Feb 28, and the changes to include Luna M6 in the 4.40.Beta1-SNAPSHOT only happened on Mar
13-14 [1].
[1]
https://github.com/jbosstools/jbosstools-target-platforms/commits/4.40.x
I've updated the jobs (master and 4.2.luna) to use M6 instead of M5, but it seems like
the problem is more likely one of the above issues:
a) two different versions of package 'javax.xml.bind'
b) No property tester contributes a property com.google.gdt.eclipse.suite.isLaunchTarget
to type class org.jboss.tools.central.editors.JBossCentralEditorInput
c) SWT error - Internal browser is not available: No more handles
d) org.eclipse.swtbot.swt.finder.widgets.TimeoutException: Timeout after: 3600000 ms.:
Blocking while calculating deps
install-grinder failing in jenkins - build timing out
-----------------------------------------------------
Key: JBIDE-16755
URL:
https://issues.jboss.org/browse/JBIDE-16755
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build, testing-tools
Affects Versions: 4.2.0.Beta1
Reporter: Martin Malina
Assignee: Mickael Istria
Fix For: 4.2.0.Beta1
(Previously discussed in JBIDE-16269)
These builds are timing out:
https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/jbosstools-install-g...
https://jenkins.mw.lab.eng.bos.redhat.com/hudson/job/jbosstools-install-g...
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see:
http://www.atlassian.com/software/jira