[
https://issues.jboss.org/browse/JBDS-3924?page=com.atlassian.jira.plugin....
]
Radim Hopp commented on JBDS-3924:
----------------------------------
I tried to reproduce it on my Fedora23 machine with openjdk version "1.8.0_91"
with no success.
btw. Misha, you say you have Fedora 23, but the java package is for fedora 22 (notice the
f22 in the package). But anyway... I don't think this could matter.
Installation looks incomplete but is actually completed
-------------------------------------------------------
Key: JBDS-3924
URL:
https://issues.jboss.org/browse/JBDS-3924
Project: Red Hat JBoss Developer Studio (devstudio)
Issue Type: Bug
Components: installer
Affects Versions: 10.0.0.GA
Environment: Fedora 23
Using devstudio-10.0.0.GA-v20160603-1025-B5510-installer-standalone.jar
jvm: java-1.8.0-openjdk-1.8.0.91-2.b14.fc22.x86_64
Reporter: Misha Ali
Assignee: Denis Golovin
Labels: install, installation, installer
Fix For: 10.x
Attachments: devstudio10install.png, incomplete_install.png
Running the standalone installer file starts the devstudio install as expected, but twice
I have noticed that the Next button is available to click (indicating that the
installation has completed) when the status shows that only 2/3 of the installation steps
are concluded. (see screenshot for this screen).
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)