[
https://issues.jboss.org/browse/JBTIS-504?page=com.atlassian.jira.plugin....
]
Nick Boldt commented on JBTIS-504:
----------------------------------
{quote}
If I just eliminate all of the
certificationId="org.jboss.tools.discovery.certification.notavailable"
connectors then the user will have no idea that "Fuse Tooling" is available
under early access.{quote}
Correct. No notavailable connector == no adver'teasing.
You can certainly say {quote}"Select the 'Enable Early Access' check box for
an early access installation. Also available in Red Hat JBoss Developer Studio
8.x"{quote}
But a less verbose way might be:
"Enable Early Access to install this. Also available in Red Hat JBoss Developer
Studio 8."
publish Alpha2 IS discovery jars into JBT/JBDS CR1(a) discovery site
when available
-----------------------------------------------------------------------------------
Key: JBTIS-504
URL:
https://issues.jboss.org/browse/JBTIS-504
Project: JBoss Tools Integration Stack
Issue Type: Bug
Components: distribution
Affects Versions: 4.3.0.Alpha2
Reporter: Nick Boldt
Assignee: Paul Leacu
Fix For: 4.3.0.Alpha2
Attachments: is-in-dev.png, is-in-dev_JBDS.png
Per the details in JBIDE-20100, when IS is ready to go, it needs to provide the discovery
jars into the JBT/JBDS CR1 site so that the "not available" connectors will be
seen in JBT/JBDS.
--
This message was sent by Atlassian JIRA
(v6.4.11#64026)