[
https://issues.jboss.org/browse/JBIDE-20343?page=com.atlassian.jira.plugi...
]
Mickael Istria commented on JBIDE-20343:
----------------------------------------
[~fbricon] I went into more details, and here is what I think is the issue with this job:
it is a workspace job (that locks workspace changes) in which one the download of
dependencies happen for some time. A better approach would be to resolve dependencies in
one job, and then to update project in the WorkspaceJob (if even necessary).
Should I open a Bugzilla ticket for that?
Processing easymport cannot be stopped in reasonable time
---------------------------------------------------------
Key: JBIDE-20343
URL:
https://issues.jboss.org/browse/JBIDE-20343
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: easymport
Affects Versions: 4.3.0.Beta2
Environment: JBDS 9.0.0.Beta2, L64
Reporter: Jiri Peterka
Assignee: Mickael Istria
Fix For: 4.3.0.CR1
During Easyimport operation it's unable to stop it. There is red stop box but it
doesn't do anything in reasonable time.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)