[
https://issues.jboss.org/browse/JBIDE-23350?page=com.atlassian.jira.plugi...
]
Rob Stryker resolved JBIDE-23350.
---------------------------------
Resolution: Out of Date
This no longer seems replicatable and the UI differs from the description, so I suspect
[~adietish] has already made large fixes here.
Specifically, when i right-click an image and select 'deploy to openshift', a
dialog appears which seems to recognize both the openshift and docker connections
immediately. The 'next' button is enabled, and the 'finish' button is not.
So I suspect this is out of date.
Deploy Docker Wizard: Prompt to enter credentials contains Finish
button
------------------------------------------------------------------------
Key: JBIDE-23350
URL:
https://issues.jboss.org/browse/JBIDE-23350
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: cdk, openshift
Affects Versions: 4.4.2.AM2
Reporter: Marián Labuda
Assignee: Rob Stryker
Priority: Minor
Labels: deploy_docker_wizard, openshift_v3
Fix For: 4.5.0.AM1
When opening Deploy Image to OpenShift wizard from context menu of a docker image and
there was no OpenShift connection selected, OpenShift connection wizard is shown with
Finish button, although connection is active (connected). There should be opened the
Deploy Image to OpenShift with the connection wizard page and it should have next button.
--
This message was sent by Atlassian JIRA
(v7.2.3#72005)