[
https://jira.jboss.org/jira/browse/TEIID-378?page=com.atlassian.jira.plug...
]
Steven Hawkins resolved TEIID-378.
----------------------------------
Resolution: Deferred
Deferring post 6.1.1 console work.
Only synchronize referenced connector bindings when importing a new
VDB
-----------------------------------------------------------------------
Key: TEIID-378
URL:
https://jira.jboss.org/jira/browse/TEIID-378
Project: Teiid
Issue Type: Feature Request
Components: Console
Affects Versions: 6.0.0
Reporter: Marc Shirley
Priority: Minor
Fix For: 6.2.0
Synchronization with failed bindings causes an error dialog in Console. During a VDB
import (and the default synchronization at the end), this causes a user to believe there
is an issue with the newly imported VDB.
Per I-T #214848 by john lee:
Summary:
Syncronization of unrelated services during VDB Deployment may cause stacktraces
unrelated to the current deployment
Description of problem:
Selecting synchronize during deployment of a VDB may cause a stacktrace due to an
failing service unrelated to the deployed VDB.
How reproducible:
Deploy and sync a vdb on a server with an unrelated failing service.
Steps to Reproduce:
Actual results:
Expected results:
Additional info:
Per Van Halbert: only sync the required services w/the deployed VDB.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira