Steven Hawkins commented on TEIID-4208:
---------------------------------------
Progress on this has been slow. There are two approaches - either use a multi-threaded
approach to additional execution points in the plan that are isolated from overall plan
processing or try to insert general parallel processing at branch points. The most
logical place for isolated parallelization would be during sorting - ideally both the
initial and the merge phase (with the plan structure guiding when the parallelization is
attempted). Inserting at branch points is a little more difficult in that a similar
amount of plan analysis needs done and we have to update at least the commandcontext to
have more thread-safe logic. Initial testing with either has not been all that positive.
It may also be worth some time to just do more issues like TEIID-4210 (such as sort /
dependent join latency) as well.
Increase plan parallelism
-------------------------
Key: TEIID-4208
URL:
https://issues.jboss.org/browse/TEIID-4208
Project: Teiid
Issue Type: Sub-task
Reporter: Steven Hawkins
Assignee: Steven Hawkins
Fix For: 9.x
Increased parallelism within the plan, which includes parallelization of source queries
via partitioning beyond multi-source and parallelizing the execution of union branches.
--