]
Max Rydahl Andersen commented on JBIDE-20453:
---------------------------------------------
[~nickboldt] your last comment ends with:
{quote}
Thus:
(TODO left for when we're
releasing CR1)
{quote}
which I assume implies this is where I should go look and see the result of this now
resolved jira but I still see 4 different zips here so not sure what the actual suggested
result is ?
Should it not just be main tools updatesite.zip (which is our components + Central + TP)
and then *one* zip download for Earlyaccess (which you probably view as EA+ additional TP)
?
Or do you really imply that we will duplicate the same TP into both Earlyaccess and
Central ?
Is that really necessary ?
Instead of 4 zips, merge Central+TP and EA+TP into 2 composite repos
for easier offline use (similar to what we had for JBDS 8)
-------------------------------------------------------------------------------------------------------------------------------
Key: JBIDE-20453
URL:
https://issues.jboss.org/browse/JBIDE-20453
Project: Tools (JBoss Tools)
Issue Type: Bug
Components: build, central, updatesite
Affects Versions: 4.3.0.Beta2
Reporter: Nick Boldt
Assignee: Nick Boldt
Priority: Blocker
Fix For: 4.3.0.CR1
Today the offline solution [1], [2] for installing stuff from Central or Early Access
requires a pair of zips: the 3rd party content (target platform), and the stuff from JBoss
Tools.
[1]
http://www.jboss.org/products/devstudio/download/ (Central Zip doesn't include
the JBT stuff, just the 3rd party / TP content)
[2]
https://devstudio.redhat.com/9.0/staging/updates/ (both zips shown)
We should combine these into a single, larger zip, such that the offline solution
requires only a single zip and there's no confusion about what a Central Zip is.