[
https://jira.jboss.org/browse/JBIDE-6582?page=com.atlassian.jira.plugin.s...
]
Vlado Pakan commented on JBIDE-6582:
------------------------------------
Complete test suite needs about 10 minutes to run on local PC what means it easy can run
for more than 15 minutes on Hudson slave. Some of these tests are dependent on each other
so it's not easy to split them. Longest test case run for 5 minutes what is quite long
but this test case starts and stops AS. I think if timeout 900 seconds is for one
particular test and not for complete test suite then there happened some error in test and
test stayed blocked forever. For this I need log file to take a look at.
org.jboss.tools.drools.ui.bot.test takes more than 15 mins - split
into smaller pieces?
---------------------------------------------------------------------------------------
Key: JBIDE-6582
URL:
https://jira.jboss.org/browse/JBIDE-6582
Project: Tools (JBoss Tools)
Issue Type: Sub-task
Components: drools
Reporter: Nick Boldt
Assignee: Vlado Pakan
Fix For: 3.2.0.M1
[ERROR] Failed to execute goal org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test
(default-test) on project org.jboss.tools.drools.ui.bot.test: Error while executing
platform: Error while executing external command, process killed. Process timeout out
after 900 seconds -> [Help 2]
org.apache.maven.lifecycle.LifecycleExecutionException: Failed to execute goal
org.sonatype.tycho:maven-osgi-test-plugin:0.9.0:test (default-test) on project
org.jboss.tools.drools.ui.bot.test: Error while executing platform
at org.apache.maven.lifecycle.internal.MojoExecutor.execute(MojoExecutor.java:141)
Does this test need more time? Can it be split into smaller pieces?
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://jira.jboss.org/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira