Very well.
If that's the case (I'll check with Dimitris they don't take any
shortcuts) we can have SPI 3.0 M1 in there. Even better ;)
Porting the SPI 3.0 to Beta 4 is not much effort i think.
/Heiko
On Thu, 2008-04-10 at 10:31 +0200, Thomas Diesler wrote:
Heiko,
Looking at
http://jira.jboss.org/jira/browse/JBAS
JBossAS-5.0.0.CR1 has 151 unresolved issues. Yesterday I was under the
impression that the release was imminent, but that was obviously a false
assumption. I think it's therefore unlikely that CR1 will come out in
time before our code freeze.
I changed the target version for 3.0.2 back to Beta4
http://jbws.dyndns.org/mediawiki/index.php?title=Supported_Target_Containers
cheers
-thomas