For the record I report Jozef priority list here (better thread name)
Great to see CDI-377 on the top of your list ;
Antoine
Antoine Sabot-Durand
Le 7 nov. 2013 à 16:40, Antoine Sabot-Durand <antoine.sabotdurand(a)gmail.com> a écrit
:
Hi all
Maintenance Release is indeed quite critical. As stated by Pete we should have a tight
scope but address significant issue or needed clarification. Some interoperability issues
should also IMO be studied to see if we can address them in 1.1.1 (the
https://issues.jboss.org/browse/CDI-377 comes to my mind).
As we are a bit late on this MR, I propose to try to have it time boxed (deliver early,
deliver often) to show we’re still alive ;) .
My main idea is to prioritize issues, give us a deadline (not too straight) and do the
maximum in this time frame.
WDYT
Antoine