[
https://issues.jboss.org/browse/RF-12552?page=com.atlassian.jira.plugin.s...
]
Jiří Štefek updated RF-12552:
-----------------------------
Steps to Reproduce:
# Deploy metamer and open
http://localhost:8080/metamer/faces/components/richCalendar/simple.xhtml
# set @minDaysInFirstWeek to 2
# open popup and switch to January 2011
# check if the first week contains at least 2 days (on January 2011 it should contain all
7 days and the first week begins from 2nd of January).
Workaround Description: (was: # Deploy metamer and open
http://localhost:8080/metamer/faces/components/richCalendar/simple.xhtml
# set @minDaysInFirstWeek to 7
# open popup and switch to January
# switch years and check if the first week contains all 7 days.)
rich:calendar: @minDaysInFirstWeek is not working in popupPanel and
EDT
-----------------------------------------------------------------------
Key: RF-12552
URL:
https://issues.jboss.org/browse/RF-12552
Project: RichFaces
Issue Type: Bug
Security Level: Public(Everyone can see)
Components: component-input
Affects Versions: 4.3.0.M1
Environment: RichFaces 4.3.0-SNAPSHOT
Metamer 4.3.0-SNAPSHOT
Apache Tomcat 7.0.30 / JBoss AS 7.1
OpenJDK Runtime Environment 1.6.0_24-b24 @ Linux
Firefox 16.0 @ Linux x86_64
Reporter: Jiří Štefek
Labels: calendar
Fix For: 5-Tracking
This attribute should influence, that each first week of each year should contain at
least a minimum of days.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see:
http://www.atlassian.com/software/jira