Since Alpha1, a number of our 3rd party requirements have been updated.
So, as I figured it was less work to reopen existing JIRAs than to
create new ones. For those re-opened, I've also renamed (where needed)
and re-targeted to Beta1.
Here's the overall JIRA:
https://issues.jboss.org/browse/JBDS-2484
In it you'll find links to the JIRAs related to reviewing these changes:
* Atlassian 3.2.0.v20130212 -> 3.2.1
* egit 2.3 -> 3.0
* GWT 3.2.1 -> 3.2.3.v201304260926-rel-r42
* PMD 3.2.6 -> 4.0.0
* SpringIDE (same version 3.2.0.201303060654-RELEASE but now on a
Kepler-based update site instead of Juno-based one, so installation /
dependencies might have changed?)
* Subclipse 1.8.18_1.7.8.1 -> 1.8.20_1.7.9.1
* SWTBot 2.1 -> 2.1.1.201305101559
* TestNG 6.8.0.20121120_1820 -> 6.8.1.20130330_0839
Cheers,
--
Nick Boldt :: JBoss by Red Hat
Productization Lead :: JBoss Tools & Dev Studio
http://nick.divbyzero.com