Planner: Forager should support gradual (time gradient based) highering of
minimalAcceptedSelection and minimalDoableSelection
------------------------------------------------------------------------------------------------------------------------------
Key: JBRULES-2572
URL:
https://jira.jboss.org/browse/JBRULES-2572
Project: Drools
Issue Type: Feature Request
Security Level: Public (Everyone can see)
Components: drools-planner
Reporter: Geoffrey De Smet
Assignee: Geoffrey De Smet
Fix For: FUTURE
minimalDoableSelection first needs to be supported too.
minimalDoableSelection 4 means that at least 4 doable moves should have been iterated over
(nvm if they are accepted or not)
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://jira.jboss.org/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira