[
http://jira.jboss.com/jira/browse/JBPM-412?page=all ]
Ronald van Kuijk updated JBPM-412:
----------------------------------
Fix Version/s: jBPM 3.3
(was: jBPM 3.2)
Slipping, due to build changes, code changes and the lack of time to keep up. Both should
have stabilzed after 3.2 so 3.3 is a more realistic timeline
have process start accept a map of variables
--------------------------------------------
Key: JBPM-412
URL:
http://jira.jboss.com/jira/browse/JBPM-412
Project: JBoss jBPM
Issue Type: Feature Request
Components: Core Engine
Affects Versions: jBPM 3.0.1
Reporter: Ronald van Kuijk
Assigned To: Ronald van Kuijk
Priority: Minor
Fix For: jBPM 3.3
Original Estimate: 2 hours
Remaining Estimate: 2 hours
The processstart api has no option of accepting variables. This way you cannot use them
in the process-start event. This fires when it is started, before you can set any
variables. Be passing e.g. a map of variables to the process start this becomes possible.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
http://jira.jboss.com/jira/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira