]
Guilherme Baufaker Rêgo updated SWSQE-612:
------------------------------------------
Labels: infrastructure (was: )
QE CI/CP Integration - stage 2
------------------------------
Key: SWSQE-612
URL:
https://issues.jboss.org/browse/SWSQE-612
Project: Kiali QE
Issue Type: Story
Reporter: Filip Brychta
Assignee: Michael Foley
Priority: Minor
Labels: infrastructure
This story is to track future tasks when the stage 1 is finished.
Tasks from this story might be worked simultaneously with stage 1 tasks but with lower
priority.