[
https://issues.redhat.com/browse/DROOLS-2845?page=com.atlassian.jira.plug...
]
Kris Verlaenen updated DROOLS-2845:
-----------------------------------
Sprint: 2019 Week 47-49 (from Nov 18), 2019 Week 50-52 (from Dec 9), 2020 Week 01-03
(from Dec 30), 2020 Week 04-06 (from Jan 20), 2020 Week 07-09 (from Feb 10), 2020 Week
10-12 (from Mar 2) (was: 2019 Week 47-49 (from Nov 18), 2019 Week 50-52 (from Dec 9),
2020 Week 01-03 (from Dec 30), 2020 Week 04-06 (from Jan 20), 2020 Week 07-09 (from Feb
10))
Extend the existing verifier to support DMN tables
--------------------------------------------------
Key: DROOLS-2845
URL:
https://issues.redhat.com/browse/DROOLS-2845
Project: Drools
Issue Type: Epic
Components: DMN Editor, verifier
Reporter: Toni Rikkola
Assignee: Toni Rikkola
Priority: Optional
Labels: UX, drools-tools, verifier
h1. Goal
Reuse the V&V created for Guided Decision Tables on the DMN tables.
h1. Workload divided to steps
I propose the work goes in the following steps. After each step I should be able to merge
into master.
Steps:
# Move Verifier core to kie-wb-common
# Move V&V reporting UI to kie-wb-common
# Make the web worker connector reusable for different V&V types
# -Make a servlet module for DMN that allows the download of the Web Worker.-
# Create an adapter for DMN tables
# Add support for ranges ( these are given in DMN so no need to use JSR303 )
# Duplicate i18n of the V&V for DMN or unify the reports so that the terms make
sense
The workload has changed. Now the goal is to reuse the DRL V&V codes in the existing
DMN Codes. This means most of the work done for this ticket has no effect and the goal is
to adjust to existing DMN V&V reporting, not the other way around.
--
This message was sent by Atlassian Jira
(v7.13.8#713008)