[
https://jira.jboss.org/jira/browse/JBCACHE-1386?page=com.atlassian.jira.p...
]
Manik Surtani commented on JBCACHE-1386:
----------------------------------------
Thanks for volunteering to help with this, Dominik.
Here are a few more ideas:
1. By default we should change the Maven Surefire plugin to run tests in parallel, with,
say, 20 threads. (See
http://maven.apache.org/plugins/maven-surefire-plugin/test-mojo.html)
2. Tests that cannot be run in parallel, for whatever reason, should be annotated with
sequential = true (see
http://testng.org/doc/documentation-main.html#annotations)
3. Remaining tests - will need to make sure all class-level fields are moved to the
methods so there is no concurrency problem.
4. Will need to make sure tearDown() methods properly stop caches started by the
UnitTestCacheFactory
Thanks!
Parallelize TestNG tests
------------------------
Key: JBCACHE-1386
URL:
https://jira.jboss.org/jira/browse/JBCACHE-1386
Project: JBoss Cache
Issue Type: Task
Security Level: Public(Everyone can see)
Components: Scripts and processes
Reporter: Manik Surtani
Assignee: Dominik Pospisil
Fix For: 3.0.0.GA
Stuff that will need to rely on JGroups' ChannelFactory for unit tests.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators:
https://jira.jboss.org/jira/secure/Administrators.jspa
-
For more information on JIRA, see:
http://www.atlassian.com/software/jira