Hi,
I have an application which is running successfully in jboss 3.2.5. As per the new
requirment i need to add one more ear file which has a different work flow. Is it possible
to deploy two different ear in a single jboss, then how the ds file will work for
different database connection ? Which is the best design that i can do with this
requirment ?
Please guild me
Thanks and Regards
Rasa.
View the original post :
http://www.jboss.org/index.html?module=bb&op=viewtopic&p=4222843#...
Reply to the post :
http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&a...