Too big change IMO for 5.2.
@Vladimir, did you check with Mircea which JIRAs you could help with which have higher
prio for 5.2?
Cheers,
On Nov 27, 2012, at 9:07 PM, Vladimir Blagojevic <vblagoje(a)redhat.com> wrote:
Hi,
Although
https://issues.jboss.org/browse/ISPN-2284 is charted for 6.0 I
would like to see if there is a possibility to finish it for 5.2. Most
of the parallel execution I have done already this and last week [1].
However, this change is not limited to map/reduce package only as we
might possibly want to have a separate executor for map/reduce execution
on each node. These changes affect global configuration and are not
confined to map/reduce packages only. Or should we simply use transport
executor for execution of these tasks for now and should the need arise
introduce separate executor in the future releases?
Regards,
Vladimir
[1]
https://github.com/vblagoje/infinispan/tree/t_2284
_______________________________________________
infinispan-dev mailing list
infinispan-dev(a)lists.jboss.org
https://lists.jboss.org/mailman/listinfo/infinispan-dev
--
Galder Zamarreño
galder(a)redhat.com
twitter.com/galderz
Project Lead, Escalante
http://escalante.io
Engineer, Infinispan
http://infinispan.org