olddave [
http://community.jboss.org/people/olddave] created the discussion
"Re: Mismatch between BPMN2 xml capability and that of the designer"
To view the discussion, visit:
http://community.jboss.org/message/620940#620940
--------------------------------------------------------------
Hi,
I solved the problem I had on how to map a Process level parameter into a WorkItem
variable using the org.drools.eclipse plugin propery sheets with the help of folk in
another thread. The main problem here is I never saw any documentation on how to do this
and nearly all ansers her einthe forum refer to the xml directly, not the designer usage.
This means I no longer need to access the session because I could communicate parameters
between Process level and WorkItem level without the need to get that data through the
session.
Of course at some point I assume I will have to switch between the org.drools.eclipse
5.2.0 Eclipse plugin to the shiny new BPMN2 designer, although it is not clear that this
migration will be required, because once again I could not find a direction statement on
whether the BPMN2 designer is an alternative designer or is to supercede the
org.drools.eclipse 5.2.0 designer.
Thx.
Ed
--------------------------------------------------------------
Reply to this message by going to Community
[
http://community.jboss.org/message/620940#620940]
Start a new discussion in jBPM at Community
[
http://community.jboss.org/choose-container!input.jspa?contentType=1&...]